Open menu Close menu
Compliance

The rules we work under

What a procurement team needs to read before prequalifying: which standards a result is validated against, what happens to client data, and how each document is coded.

To confirm

Reference standards

These are not certifications: they are the standards a result is contrasted against and an acceptance criterion is set from. The one that applies is declared in each project proposal.

Table · Reference standards by field of application
Standard What it governs Where it applies
ASME V&V 20 Verification and validation in CFD and heat transfer How model deviation against site measurement is declared
ASME BPVC VIII Div. 2 Design by analysis of pressure vessels Acceptance criteria for pressure equipment, Struct line
AWS D1.1 Structural welding in steel Detail and fatigue category in welded joint submodels
NCh433 Seismic design of buildings Inputs to modal and response spectrum analysis
NCh2369 Seismic design of industrial structures and installations The one that governs plant structures on site

The physics solved, the usual discretisation and the solver per line are in the capability matrix. See capabilities

Data and confidentiality

  • Reciprocal confidentiality for 3 years from service close
  • Result files and processed geometry remain with the client
  • Client geometry is not reused in another engagement nor published as a case without written authorisation
  • Calibration tests and site measurements are cited with the operation anonymised unless the client authorises naming it
  • Your data is used only to answer this request. It is not shared with third parties.

Document traceability

  • Every proposal, scope minute and report is issued with a code and revision
  • The acceptance criterion is signed into the scope minute before a mesh exists
  • Every deliverable is issued in Spanish and English
  • Assumptions, boundary conditions and solver version are declared in the report

Company facts

Disciplines
CFD · FEA · DEM
Based in
Santiago, Chile
Delivery languages
Spanish and English, from the start
Response to a request
48 working hours, with scope and schedule
Field
Chilean mining operations
To confirm

These are published once the owner confirms them against the register. Until then they do not appear on the site: a short fact sheet beats an optimistic one.

Pending confirmation

  • Registered company name and tax ID
  • Date of incorporation
  • Team composition and credentials
  • Accumulated years of experience
  • Current supplier registrations
  • Professional indemnity insurance
  • Management system certifications